Our Location | Contact Us

Your position :Home-Trade NewsTrade News

The Preparation Work before Driving——Crushing Equipment
Posted: 2011-10-5
The proper preparation work before driving crushers is one of the main way to maintain crushing equipment. And the followings are some preparation work for crushers:

①To check the bearings has refueled.
②To check jaw plate, bearings, draw bar, supporting plate, spring and triangle belt are in good condition; fasteners are firm; Protective devices are complete; there is no barrier around the moving parts and so on.
③To adjust the feeding quantity of vibrating feeder, and increase from small materials to big materials, it is usually controlled the height of materials is 4/5 of the jaw chamber height. In addition, it should be also noticed that the largest particle size of materials is no more than 4/5 of the feed opening width. What’s more, when the feed particle size is continuous and uniform, the crusher can brings into play its optimal efficiency.
④To ensure no materials are in the crushing chamber before opening the crusher.
The start-up sequence is in turn dust collector, crusher, discharging belt conveyor charging belt conveyor, vibrating feeder and so on. To adjust the feeding quantity of vibrating feeder, and increase from small materials to big materials, it is usually controlled the height of materials is 4/5 of the jaw chamber height. In addition, it should be also noticed that the largest particle size of materials is no more than 4/5 of the feed opening width. What’s more, when the feed particle size is continuous and uniform, the crusher can brings into play its optimal efficiency.
 
Tel: 86-371-63712098
Fax: 86-371-60630091
Email: 123@86371.cn
MSN: 460000
Home | Ord Page | XmlChina Henan Heavy Industrial Factory Add:NO.239 road nanyang, Zhengzhou, China
Postcode:450001 T E L : +86-371-63712098